Industrial land in Aguascalientes: new supply and what to check on water and power
Five projects add 255 ha of new industrial land in Aguascalientes, led by San Marcos Valley. What to ask about water, power and gas before buying.

With vacancy at 0.9%, many companies arriving in Aguascalientes buy or lease a lot and build. Five new industrial land projects add up to 255 hectares. Before choosing, check two things that can stall a project even when the lot is good: water and electrical capacity.
New land supply
| Project | Corridor | Area | Profile |
|---|---|---|---|
| San Marcos Valley | South | 140 ha | 5 phases; the first (~30 ha) has been operating since August 2026 |
| Alea Park | North | 65 ha | Lots from 5,094 m², for about 40 companies |
| Santa Fe Tecnopark II | North | 25 ha | 21 lots of 0.5 to 1.5 ha |
| P.I. Rincón de Romos | Northern part of the state | 15 ha | Light industry for domestic companies, planned |
| ABA Park | North | 10 ha | Micro-lots of 360 to 600 m² for SMEs |
Sources: developers, Mexico Industry, Líder Empresarial, Cluster Industrial, Solili.
San Marcos Valley, developed by Grupo Lintel, is investing MXN 1.7 billion in the park and has its own well, elevated tank and treatment plant. It is in the South corridor, home to about 80% of the state's industrial construction, next to FINSA, Vesta and the Nissan complexes. The northern projects target mid-size companies and SMEs.
Industrial parks in the metropolitan area by corridor. Data: © OpenStreetMap contributors; Álcamo inventory.
Water: no new concessions
All five aquifers in the state have been listed in deficit in every official publication since 2013. In the Aguascalientes Valley aquifer, which supplies the capital and the Highway 45 corridor, concessioned water exceeds recharge by 95.8 million m³ a year (DOF 2023).
Recharge and concessioned volume by aquifer, hm³ per year; the figure shows the deficit. Source: CONAGUA, DOF 2023.
A new industrial user can only get water in three ways: by buying existing rights, through the park's or the local utility's network, or with treated water. So before looking at the price per m², ask whether the park has water rights, its own well or a written supply commitment, and how many m³ a month go with your lot.
Power: plenty of generation, tight distribution
The state generates more electricity than it consumes, with 1,209 MW of permitted solar capacity in operation. The limit is in the transformer banks that deliver power to the parks: the bank at the San Francisco de los Romo substation ran at 98.6% of capacity in 2024 (SENER, PAMRNT 2025–2039).
CFE (the federal power utility) has scheduled a 30 MVA bank in Jesús María for 2029 and a MXN 195 million substation in 2026. In the meantime, for projects above 1 to 2 MVA, request a CFE feasibility letter before signing or confirm that the park has its own substation (FINSA, for example, has 30 MVA).
Natural gas
Two trunk pipelines cross the state. Naturgy will invest MXN 276 million in a city gate in the northern area, and Esentia more than MXN 1.65 billion in a compression station announced in June 2026. Even so, few parks confirm an internal gas network.
What to ask each park
| Question | Why |
|---|---|
| Water rights, own well or guaranteed supply? How many m³ a month? | No new concessions |
| Own substation or a written CFE feasibility letter? How many MVA? | Distribution banks near their limit in the north |
| Internal natural gas network? | Few parks have one |
| Is the infrastructure for your lot finished? | New parks deliver in phases |
| Land-use and municipal permits for your activity? | Avoids construction delays |
Download the Industrial Market Report Aguascalientes Q3 2026
Evaluating industrial land? Álcamo can help with due diligence. Write to us at alonso.lpz@alcamo.com.mx or call +52 449 311 0031.
Data as of October 12, 2026. Sources: CONAGUA / DOF 2023, SENER (PAMRNT 2025–2039), CFE, Cluster Industrial, Solili, developers.
Advisory
Looking for industrial space, land or retail in the Bajío?
We help you compare options with market data, from the search to the signing.
Talk to an advisor →
Industrial Market Report · Aguascalientes · Q3 2026